{"id":2887,"date":"2013-05-27T16:50:18","date_gmt":"2013-05-27T14:50:18","guid":{"rendered":"https:\/\/ambbaghdad.esteri.it\/news\/dall_ambasciata\/2013\/05\/preselezione-porto-umm-qasr-2\/"},"modified":"2013-05-27T16:50:18","modified_gmt":"2013-05-27T14:50:18","slug":"preselezione-porto-umm-qasr-2","status":"publish","type":"post","link":"https:\/\/ambbaghdad.esteri.it\/en\/news\/dall_ambasciata\/2013\/05\/preselezione-porto-umm-qasr-2\/","title":{"rendered":"PRESOLICITATION OF CONSTRUCTION FIRMS EXPERIENCED IN WORKING IN THE MIDDLE EAST REGION IN SUBMITTING A FIRM-FIXED PRICE OFFER FOR A PROJECT OF THE U.S. ARMY CORPS OF ENGINEER (USACE) MIDDLE\u00a0EAST DISTRICT."},"content":{"rendered":"<p><P><BR>The project includes the following elements: <BR><BR>a. Design and construct a floating pier, approximately 165m in length, for berthing of vessels with draft of up to 6 meters. This new pier will connect to an existing fixed concrete pier by means of a new ramp or gangway that is included in this design-build contract. The proposed pier will include utility connections to existing or future infrastructure to include electrical shore power connections, compressed air, fresh (non-potable) water, fuel lines and lighting. <BR><BR>b. Design and construct supporting facilities for the floating pier. These Supporting facilities include electrical, water and fuel infrastructure, transformers, site work, a paved road connecting the pier to existing road infrastructure and drainage. <BR><BR>c. Design and execute an initial dredging operation from the boundary of the commercial port to the southern border of Iraq as shown in the <STRONG><EM><A href=\"\/resource\/2013\/05\/Avvisodipreselezione1.doc\">Presolicitation<\/A><\/EM><\/STRONG>. <BR><BR><\/P><\/p>\n","protected":false},"excerpt":{"rendered":"The project includes the following elements: a. Design and construct a floating pier, approximately 165m in length, for berthing of vessels with draft of up to 6 meters. This new pier will connect to an existing fixed concrete pier by means of a new ramp or gangway that is included in this design-build contract. The [&hellip;]","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"tags":[],"class_list":["post-2887","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/posts\/2887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/comments?post=2887"}],"version-history":[{"count":0,"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/posts\/2887\/revisions"}],"wp:attachment":[{"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/media?parent=2887"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ambbaghdad.esteri.it\/en\/wp-json\/wp\/v2\/tags?post=2887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}